A-8

CAMERON PARISH
POLICE JURY
NOTICE OF PUBLIC MEETING
AGENDA – VOTING SESSION
FRIDAY, APRIL 16, 2021
2:00 P.M.
Cameron Parish Police Jury
West Annex – Board Room
148 Smith Circle, Cameron, LA
1. Call to Order
2. Pledge of Allegiance/Prayer
3. PUBLIC COMMENT
4. Approval of Minutes
5. Approval of Add-Ons:
6. Drilling & Pipeline Permits:
a. United World Energy Corporation – Chalkley Field, Sections 9, 10, 11, 15, T12S, R6W, (proposed installation of a 3-inch flowline to serve the Cameron Parish School Board 16 No. 1 Well, flowline to be installed from existing well site to an existing facility having a total length of 10,435 ft.), Cameron Parish, LA. (210409)
7. Other Permits:
a. Fieldwood Energy, LLC – Offshore, West Cameron Area, (proposed removal and abandonment of 8-inch flowlines at WC 49 & 53 and SA 3), Cameron Parish, LA. (210401)
b. Fieldwood Energy, LLC – Creole, West Cameron Area, Section 31, T15S, R7W,(proposed to install concrete mats on existing 10-inch gas pipeline needed to protect the exposed sections of the 10-inch pipeline caused by wave erosion and recent hurricanes), Cameron Parish, LA. (210402)
c. Cameron Parish Gravity Drainage District No. 5 – Muria Canal, Sections 13-16, T14S, R6W, Sections 18-22, T14S, R5W, (proposed to perform maintenance cleanout of Muria Canal approximately 39,836 linear ft. needed for drainage), Cameron Parish, LA. (210403)
d. Cameron Parish Gravity Drainage District No. 5 – Grand Chenier, Sections 11, 12, 14, 23, 26,48, & 49, T15S, R5W, (proposed to perform maintenance cleanout of Miller Bayou approximately 28,230 linear ft. for drainage), Cameron Parish, LA. (210404)
e. Plains Marketing, LP – Grand Chenier, Section 42, T15S, R6W, (proposed after-the-fact permit application to remove debris and damaged crude oil tanks resulting from Hurricane Laura; all debris recovery activities have been completed under EUA 20-044), Cameron Parish, LA. (210405)
f. Cameron Parish Gravity Drainage District No. 5 – Chenier Perdue, Sections 22-24, T14S, R6W, (proposed to perform maintenance cleanout of Chenier Perdue Canal approximately 11,195 linear ft. for drainage), Cameron Parish, LA. (210406)
g. Cameron Parish Gravity Drainage District No. 5 – Grand Chenier, Sections 21 & 22, T15S, R4W, (proposed cleanout of 2B-Canik Bayou approximately 6,296 linear ft. for drainage), Cameron Parish, LA. (210407)
h. CenterPoint Energy, Inc. – Cameron & Creole Areas, (proposed Cameron-Creole Replacement Phases 1-6; includes replacement of approx. 47,711 linear ft. of 2-inch and 4-inch natural gas pipeline main and service lines and stations needed in order to continue to serve customers in the area), Cameron Parish, LA. (210408)
i. Pelican Point Homeowners Association – Big Lake, Pelican Point Subdivision, Section 21, T12S, R9W (proposed to perform maintenance dredging on existing canals needed to remove accumulated sediment to allow personal watercraft access to the subdivision), Cameron Parish, LA. (210410)
j. Cameron Parish Gravity Drainage District No. 4 – Creole, Section 32 & 33, T14S, R7W, (proposed to perform maintenance cleanout of Lateral B approximately 7,195 linear ft. for drainage), Cameron Parish, LA. (210411)
8. Appointments:
a. Cameron Parish Waterworks District No. 11 – Gerald Richard resigned, moved out of parish
b. Fire Protection District No. 1 – Tammy Peshoff, term expired
c. Fire District No. 1 Civil Service Board – Margaret Jones, term expired
d. Gravity Drainage District No. 4 – Leslie Griffith, term expired
e. Gravity Drainage District No. 7 – Don Trahan, term expired
f. Gravity Drainage District No. 7 – Rodney Billiot, term expired
g. Gravity Drainage District No. 8 – James “Bozo” Cox, term expired h. Recreation District No. 9 – Susie Fawvor, term expired
9. Authority to Advertise for Bids for the Official Journal
10. Proclamation – Declare April 2021 as Fair Housing Month
11. Proclamation – Declare April 5-9, 2021 as National Community Development Week
12. Proclamation – Declare March 2021 as Red Cross Month
13. Approve Rigid Constructors, LLC, Change Order No. 3 – CDBG Rockefeller Shoreline Protection Project (ME-37/PARA3301) Reconciliation of bid quantities to actual quantities
14. Approve Rigid Constructors, LLC, Change Order No. 1 – Cameron Parish Shoreline Stabilization Project, Little Florida Beach Project 2189153 – Increase cost $633,050.00 to add three (3) additional breakwaters east of the current alignment and increase contract time 30 additional days
15. Accept CDBG-DR Rockefeller Shoreline Protection Project (ME-37/12APRA3301 as substantially complete
16. President Authority to sign resolution granting the Parish Administrator to execute the RESTORE Act Direct Component application, certification and all relevant documents for the execution of the project
17. Authority to Sell Surplus Equipment through public auction with Guinn Auctions
18. Approve Proces Verbal/Promulgation Resolution of proposition presented to voters in election held March 20, 2021
a. Fire Protection District No. 14 – Renewal of Ad Valorem tax of 5.70 mills
b. Fire Protection District No. 15 – Renewal of Ad Valorem tax of 8.16 mills
19. Approval to move monthly Police Jury Meeting from Thursday, May 13, 2021, to Tuesday, May 11, 2021
20. Authority to advertise Ordinance change for the Consolidation of Cameron Fire District Boundaries 1, 7, & 9
21. Pay Bills
Adjourn Meeting
* Indicating Add-ons
Agenda Posting Date:_ Posting Time:
Signed:___

In accordance with the Americans with Disabilities Act, if you need special assistance, please contact Mary Carroll at (337) 775-5718, describing the assistance that is necessary.
This institution is an equal opportunity provider. To file a complaint of discrimination, write: USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C. 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider, employer, and lender.
RUN: Apr. 8 (A 8)