Cameron and Vermilion parishes held a groundbreaking ceremony Monday, Oct. 21, for a $25 million flood mitigation project that will create a more resilient Louisiana, using the Louisiana Watershed Initiative’s approach to reducing flood risk and respecting the natural functions of the state’s watersheds.
The Mermentau Basin Inundation Relief project will connect current drainage laterals along La. Hwy. 82 in an effort to redirect stormwater north of the highway. This will involve widening downstream channels and installing new gates at the East End Locks and other drainage features, which will help manage the increased flow and improve flood storage within the basin.